Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online today at 08:04

Candidate

Male, 39 years, born on 19 April 1985

Considers offers

Atyrau, willing to relocate, prepared for business trips

The approximate area of the job search is specified

Construction or Commissioning Manager, Superintendent ,Supervisor, Mechanical Engineer

Specializations:
  • Other

Employment: full time

Work schedule: full day, shift schedule

Work experience 16 years 2 months

May 2024currently
1 year
Karachaganak Petroleum Operating

Aksay (Kazakhstan), kpo.kz

Oil and Gas... Show more

Mechanical Commissioning Supervisor
 Supervise EPC Contractor in delivering the pre-commissioning and commissioning requirements as per the contract SoW for the Mechanical discipline. Ensuring competent Commissioning & Start up input is provided timely in the development and review of the Engineering documents such as 3D model reviews, HAZOP, P&IDs, PFDs, Single Line Diagrams, etc. Supervise the EPC Contractor staff ensuring safe execution of the Commissioning & Start Up activities. Supervise the preparation of all commissioning activities related to the Mechanical discipline in cooperation with Contractor and vendors. This includes preparation of pre-commissioning procedures, commissioning procedures and detailed commissioning schedules. Develop programs and calendar schedules of commissioning work and testing, submit for management agreement. Coordinate work of personnel and ensure reasonable consumption of reserves and materials required for start-up and operation of facilities and ensure continuous process during commissioning. Contribute to the development of Project to Asset handover process being the main link between EPC Contractor and Operations department using the Completions Management System. Quality control over work performance, make necessary revision in methods of commissioning in order to reach parameters and characteristics required for equipment and system operation, carry out adjustment. Ensuring that any outstanding actions for system hand over to commissioning are duly recorded and are effectively cleared as per procedures and regulations in place. Analyse measurement data of operation parameters, perform necessary calculations and give opinion on suitability of construction projects to operation, identify reasons of their inadequacy. Participate in walk downs jointly with EPC Contractor and Operations and follow up on closing out the punch items raised during the walk downs. Develop measures directed to optimize commissioning and testing, increase reliability and feasibility, improve commissioning work quality on a basis of introduction of up-to-date equipment and technology, and ensure its implementation. Maintain engineering documentation during installation, commissioning and testing of facilities, participate in accepting equipment for operation, completion of handover documentation, investigation of emergency, bad work, damaged equipment and developing preventive measurements. Instruct operation personnel on standards code of facilities and systems under commissioning. Cooperate in implementing national and foreign technology and advanced experience in commissioning work. Take actions to spread out advanced skills in work management for commissioning and testing. Manage personnel involved in commissioning work and ensure labour protection requirements to be met in accordance with activities being carried out.
May 2023May 2024
1 year 1 month
Novus Bolashak

Atyrau, novus-bolashak.com

Oil and Gas... Show more

SMP Commissioning Execution Engineer
Independently planning and organize completions engineering based on a good understanding of the company’s procedures, project contract, specifications, documents, drawings, codes and vendor documents. Leading a team of engineers to successfully develop commissioning deliverables in line with the project commissioning execution plan and corporate procedures while being compliant with the stringent project schedule. Leading an execution team on site through the discipline supervisors to successfully perform the previous planned pre-commissioning and commissioning activities being compliant with overall project schedule. Plans and engages the Commissioning Manager to provide inputs regarding the organization of manpower resources and deployment schedule, considering the current workload and resource availability. Reviewing Mechanical Pre-commissioning and commissioning database based on project engineering and vendor data for static equipment. Reviewing technical parts of static equipment checklists and test sheets and developing. Review all FAT & SAT documents to make sure everything is in line to project engineering data and standard systemization methodology. Follow up the Mechanical Equipment Completions managing the Completion System and clearing the outstanding item, finalizing the Mechanical system ready for commissioning. These Mechanical systems include all Static Equipment, as Heaters, Pressure Vessels, Steam Boilers, Water Tanks, Filters, Reactors, etc. Responsibility for performing all type of test including Service Test, Gross Air Leak Test. Preparation of mark-up on P&ID with showing Injection Point, Blowing Point, Drain Point etc. prior to start test and submitting to PTW. Responsibility for performing air blowing and baroscopic inspection after air blowing. Responsibility for performing all Utility Station test with witness of Operation Representative. Responsibility for performing of installation Interlocks. Dismantling and transferring to workshop all PSV valves in order to calibration according by calibration schedule. Responsible to performing System Tightness Test.
July 2022May 2023
11 months
KENT

Atyrau, kentplc.com

Construction, Real Estate, Architecture... Show more

System Completion PTW Area Controller
Accountable for supporting TCO in stewarding the SC field execution with specific responsibilities of controlling permitting activities, including coordinating/ prioritizing SIMOPS and managing energy isolation within assigned area of responsibility. 3GI SC Team is an integrated team comprised of resources from SC Contractor, Sub-contractors, MAC, Vendors and TCO staff. Coordinates team members to finalized planning, be responsible for mobilization the SC Contractor to site, stands up SC Execution in the field & leads early commissioning activities. Engage with ME&I to ensure subsystems are mechanically completed in the right sequence& ensures execution follows approved SC procedures& strategies. Supports SC Delivery Lead in stewarding safe execution of all Commissioning activities including PTW process in the SC Areas. Acts as the facility designate owner for their assigned area and monitors and manages the daily execution and permitting in the line with FGP PTW process. Ensure PTW authorization for all Mechanical scope recognizing SIMOPS impacts to other groups or discipline. Permit to Work system and SIMOPS Area controller key interfaces: ME&I PTW Team/ SC PTW Team/ Central/ Core System Completion Team/3GI System Completion Team/ ME&I Execution Team/ Project Administration, IT, Training and Travel Management/ Site Contractors/ TCO Organizations: Operations, Engineering and Project Execution
November 2021June 2022
8 months
Petrofac-Isker. New Water Treatment Project. Eskene West
Piping&Mechanical Superintendent
New Water Treatment Project. West Eskene. Coordinate the overall construction process of facilities, structures and/or pipelines and monitoring contractor performance assuring the application of all the relevant HSEQ and QA procedures, and providing technical support as required Promote a total quality work ethic and safe and pleasant work environment and establish an environment of mutual respect and teamwork with all employees. Act as a liaison with contractors and clients managing any work interfaces and enhancements to project scope. Conduct Technical Evaluation of bidders. Conduct kick-off and work progress meetings with Contractors. Undertake team briefings and inception activities to ensure all aspects of work are understood by all concerned parties. Monitor and assign work to Site Supervisors in accordance with Company’s policies and procedures and limits of authority. Monitor and control expenses related to project work and ensure organizational forecasts and budgets are met for these expenses. Monitor and manage schedules with multi-discipline interface. Monitor required contract & subcontract work activities to ensure that drawings, tools, equipment and materials are available to complete the job. Establish that contractor has engaged adequate manpower to execute the contract / subcontract towards completion dates, customer requirements. Manage contractors & subcontractors, and coordinate with consultants supporting particular area of responsibility. Raising, tracing and finalizing Technical Queries. Constant seek to implement new developments in construction technologies. Daily & weekly reporting to the line manager on the work progress.Qualifying contractors’ invoices against actual works performed. Scheduling and coordinating with contractors, subcontractors, engineers and operation. Tracking as-built documentation from beginning of construction all the way to the end. Interface with Government Officials when they carry out inspection visits on construction site. Quality and consistency of construction activities according to project scope of work. Assuring the application to project of all the relevant local norms, company standards and international best practices on accident prevention and human protection, environmental impact reduction and energy efficiency. Observe company values at any time and in all matters. Ensure that all activities are performed in a cost-effective manner. Maintain focus on technical excellence and innovation. Support collaboration and integration across departments and locations and accelerate learning and knowledge sharing. Ensure that all information, written as well as verbal, concerning the company is treated confidentially. Continue effective daily execution and optimization of activities, whilst seeking and utilizing global synergies and economies of scale. Timeliness and accuracy of installation and control information provided, including cost control information, executed works compliance to project technical specifications, work progress certification. Monitoring installation activities and controlling that their execution is in line with project plans and highlighting any possible deviations suggesting possible solutions. Collect information and data about daily work activities to the Construction Manager to verify that project is going on schedule and within the set time and budget limits.
September 2019November 2021
2 years 3 months
Consolidated Contracting Engineering&Procurement SAL Offshore

Atyrau, www.ccc.net

Construction, Real Estate, Architecture... Show more

Mechanical Construction Superintendent(Head of Area)
FGP-3GP (M&EI Blue) Project. Erection Gas Turbine Generators. Plan and direct the work activities of mechanical activities. Directs Discipline Supervisors to achieve completion of the project on schedule, within budget, with quality workmanship that conforms to original plans and specifications. Implementation activities according by Installation Work Packs. Assembling and erection Exhaust Duct items, Inlet Duct, Exhaust Stack, HVAC roof skid, wall cladding related to GTG . Assembling and erection steel members like walkways, monkey leaders, platforms, stair towers related to GTG. Coordination with Mechanical Supervisors, General Foreman’s, Foreman’s , material, and equipment needed to meet schedules. Support project and construction management with planning and utilization of proper means and methods for mechanical activities. Analyze situations, identify and forecast pertinent problems and evaluate realistic options; and recommend/implement appropriate course of action. Adhere to and support the company’s Health, Safety & Environmental Policies. Identify welding certification, training and experience appropriate for assignment scope. Attend to detail and work in a time-conscious and time-effective manner. Typically serve as lead person to coordinate process mechanical activities within their assigned scope in an active construction work site. Coordinate and implement activities and any other resource necessary to assure a safe and quality execution. Generally responsible to assure all work undertaken is within approved scope boundaries and is in full compliance. Proven ability promoting outstanding customer service and client relations.
June 2019September 2019
4 months
Tengizchevroil. Recruited by Bolashak-Atyrau agency.FGP-3GP

Atyrau, www.bolashak.com/

Construction, Real Estate, Architecture... Show more

UG Piping Supervisor
Communicate the construction requirements to all contractors’ and ensuring compliance and conformance with the safety plan, quality plan and Client requirements. Supervise and guidance of contractor’s supervision to ensure site productivity and efficiency result in meeting contract targets. Supervise and coordinate the activities of construction contractors within assigned areas. Provide daily supervisory surveillance checks and records, ensuring that contractors’ management and supervision are providing safe working conditions and permit procedures, protective equipment, experienced / qualified supervision and manpower, with reliable, well maintained equipment to execute the contracted works as per contract schedule and targets. Routinely study, check, review and validate the discipline scope of work against the appropriate Contract Requisition to ensure the Contractors correctly interpret and comply with the latest revision AFC drawings, quantities, and specifications. Strong safety awareness and adherence to safe working practices during site execution phase. Identify the hand over sequence on a system by system, area by area basis, all scheduled to produce logically planned work completions for commissioning and start-up requirements. Perform other tasks upon request from the Construction Superintendent .
December 2018May 2019
6 months
Sicim S.p.A.Branch Kazakhstan NCOC TA-2019, Offshore,Kashagan(RGI,Driling Island)

Atyrau, www.sicim.eu

Construction, Real Estate, Architecture... Show more

Turnaround Manager
To manage the Site Superintendents, Engineers and Supervisors, Foreman’s to carry out maintenance repair, shutdown maintenance and capital expenditure projects for the Plant facilities. To attend to Client's enquiries and site showround, perform cost estimation and present commercial proposals. Engage in early phase planning and organization for the turnaround with a focus on schedule and budget adherence. Incorporate HSE and Quality practices into early-stage planning. Provide direction to multi-discipline team with focus on schedule, cost, HSE, quality and oversight of contractors. Clearly defining the turnaround organization roles, responsibilities, and interfaces between the required turnaround participants. Provide leadership and guidance to the TAR team and all TAR participants during the planning and execution phases of the turnaround. Develop an accurate and timely TAR cost estimate at each stage gate of the TAR. During execution of the turnaround, effectively monitor and manage all elements of the turnaround, including Safety, Environmental, Security, Cost, Schedule, Inspection and Quality
July 2017December 2018
1 year 6 months
BI Group Engineering/LLP KAZPACO-BMEI (COF/CSF/WTF/DWP- СATRO/FGP Project)

Atyrau

Construction, Real Estate, Architecture... Show more

Mechanical Commissioning Engineer (Static Equipment)
Independently planning and organize completions engineering based on a good understanding of the company’s procedures, project contract, specifications, documents, drawings, codes and vendor documents. Leading a team of engineers to successfully develop commissioning deliverables in line with the project commissioning execution plan and corporate procedures while being compliant with the stringent project schedule. Leading an execution team on site through the discipline supervisors to successfully perform the previous planned pre-commissioning and commissioning activities being compliant with overall project schedule. Plans and engages the Commissioning Manager to provide inputs regarding the organization of manpower resources and deployment schedule, considering the current workload and resource availability. Reviewing Mechanical Pre-commissioning and commissioning database based on project engineering and vendor data for static equipment. Reviewing technical parts of static equipment checklists and test sheets and developing. Review all FAT & SAT documents to make sure everything is in line to project engineering data and standard systemization methodology. Follow up the Mechanical Equipment Completions managing the Completion System and clearing the outstanding item, finalizing the Mechanical system ready for commissioning. These Mechanical systems include all Static Equipment, as Heaters, Pressure Vessels, Steam Boilers, Water Tanks, Filters, Reactors, etc. Responsibility for performing all type of test including Service Test, Gross Air Leak Test. Preparation of mark-up on P&ID with showing Injection Point, Blowing Point, Drain Point etc. prior to start test and submitting to PTW. Responsibility for performing air blowing and baroscopic inspection after air blowing. Responsibility for performing all Utility Station test with witness of Operation Representative. Responsibility for performing of installation Interlocks. Dismantling and transferring to workshop all PSV valves in order to calibration according by calibration schedule. Filling the pre-commissioning/ commissioning QVD(Check sheet B and C).
June 2014July 2017
3 years 2 months
Tengizchevroil.Recruited by agency KISOrion/Fircoft Engineering(Special Project Group)

Atyrau

Construction, Real Estate, Architecture... Show more

Civil Site Construction Representative(Social Project "Igilik. Construction Department)
Responsible for own safety and safety of employees according to TCO Policy and Health, Safety and Environmental Protection Remains knowledgeable of safety policies and procedures and performs assigned duties in a safe manner and, while leading others, has responsibility for their safety and ensures they comply with established safety policies and procedures, and practice safe work habits. Plays an active role in project IIF and safety cultures, including participation in weekly Safety Audits, as required. Makes safety a natural part of all work performed. Responsible for conducting audits of in progress and completed work, installation and testing to ensure compliance with project design specification, drawings and RoK requirements, in a timely manner. Develops good knowledge of contract terms and ensures Contractor compliance with contract terms & conditions. Exercises control over construction progress, consistency of work scopes, delivery dates quality of construction & installation works and repair works as well as quality materials, items, structures used as per approved design package, detailed drawings, construction rools and regulations, standards, specifications, occupational safety norms. Coordinates construction activities of the contractor and fulfills the Permit to Work role of PIC(Person of Charge). Reviews and monitors contractor's construction manpower requirements and advises whether additional resources will be required to maintain the schedule due to lack of progress or material delays and productivity issues. Keep a daily Construction Work Log. Records manpower, equipment and detail activities done for the day. Signs daily time records with contractor. Provides weekly construction progress reports and brings out areas of concern for the management's attention and advises remedial actions and alternatives to maintain the schedule. Keeps track of completed construction and installation works and prepares necessary data for the reports about accomplished civil construction plans. Takes actions seeking to prevent and eliminate defects. Searches into the causes leading to failure to meet the delivery dates and deterioration of quality of construction and installation works, takes actions for their prevention and elimination. Executes the necessary technical documentation. Participates in review and alignment of design modifications occurring in the course of construction activities, promptly resolves issues concerning replacement, if need be, of materials, items and structures. Participates in the commissions responsible for the acceptance and commissioning facilities. Reviews and signs job Descriptions, and participates in weekly team meetings to review progress and status of Construction and Project initiatives.
March 2014August 2014
6 months
KIOS LLP(Recruited Expertise S.r.L.)

Atyrau

Construction, Real Estate, Architecture... Show more

Multidiscipline Skilled Welding Supervisor(Maintenance Department)
Preparing and monitoring of fabrication sequencing as per codes and standards during fabrication work, is performed in accordance with the approved construction procedure, latest IFC drawings, specifications and correct materials. Ensure that all the fabrication/welding/erection related records such as cutting list, bill of materials, weld cards, consumables etc are properly archived, and cooperate with Safety and QA/QC inspectors by performing as per their recommendations. Ensure that piping mechanical installation HSSE policy and procedure are implemented by contractors .Carry out to due diligence in welding joints. Conduct Safety walk through /safety meeting or tool box meeting. Sending feed backs to the line managers for maintaining the project schedule on time. Having a working knowledge in gas and oil field with all kind of fabrication and erection inspection techniques for various applicable standards.
December 2013March 2014
4 months
LLP NefteStroyService Ltd

Atyrau, nss.kz

Construction, Real Estate, Architecture... Show more

QA/QC Engineer(Welding,Mechanical. QA/QC Department)
Develop and determine all standards to perform inspection and tests on all procedures and oversee all testing methods and maintain high standards of quality for all processes. Review quality of all materials at site and ensure compliance to all project specifications and quality and collaborate with department for all material procurement and maintain quality of materials. Supervise effective implementation of all test and inspection schedule and ensure adherence to all procedures and coordinate with various teams to perform quality audits on processes. Assist with employees to ensure knowledge of all quality standards and ensure compliance to all quality manual and procedures and collaborate with contractors and suppliers to maintain quality of all systems. Manage lifting of all equipments and handle efficient storage of all hazardous materials and perform quality audits as per required schedule. Analyze all products and non conformance processes and evaluate all documents to ensure maintenance of optimal quality and prepare monthly reports to evaluate performance. Monitor an efficient system and record for all project activities and analyze all processes to ensure all work according to quality requirements. Manage all work methods and maintain knowledge on all quality assurance standards and monitor continuous application for all quality assurance processes and recommend corrective actions for all processes.
August 2013December 2013
5 months
LLP Dianit(Subcontract to LLP KAZAZOT,Shagyrly-Shomshyty Development Gas Wellhead Project)

Atyrau

Construction, Real Estate, Architecture... Show more

Construction Enginner(Construction Department)
Preparing and monitoring of fabrication sequencing as per codes and standards during fabrication work, is performed in accordance with the approved construction procedure, latest IFC drawings, specifications and correct materials. Ensure that all the fabrication/welding/erection related records such as cutting list, bill of materials, weld cards, consumables etc are properly archived, and cooperate with Safety and QA/QC inspectors by performing as per their recommendations. Ensure that piping mechanical installation HSSE policy and procedure are implemented by contractors .Carry out to due diligence in welding joints. Conduct Safety walk through /safety meeting or tool box meeting. Sending feed backs to the line managers for maintaining the project schedule on time. Having a working knowledge in gas and oil field with all kind of fabrication and erection inspection techniques for various applicable standards.
June 2013August 2013
3 months
ASME Contracting Service

Aktau

Construction, Real Estate, Architecture... Show more

Lead Piping Engineer(Engineering Department)
Erection plumbing and piping in Living Quarter. Determination and mark up pipe spools in isometric drawings. Mark up Welding Map. Make cut pipe length table. Make welding table .Determination pipe supports in 3D by Navis Work program. Mark up type off joint. Complete additional erection materials.
July 2012July 2013
1 year 1 month
Sicim S.p.A Branch Kazakhstan

www.sicim.eu/

Construction, Real Estate, Architecture... Show more

Technical Engineer(Engineering Department)
To carry out technical supervision in construction. Control scope of construction works and construction approved project documents, working drawings, construction codes, standards and specifications. Participate in the review and coordination in construction revision, if necessary quickly solve problems about replace materials, products, designs. Elimination the causes of breakdowns and deteriorating terms of quality of construction works. Actualize technical acceptance of completed jobs, prepares the necessary technical documents. Prepare and submitting SEQ (Site Engineering Query).Calculate all material take off including in project. Prepare and submitting MR(Material Request) Participation in the work of commissions on acceptance of construction projects and realise them into operation. Working in projects as "Water Injection System Upgrade"," Trunk line Debottleniking","MS8 Debottlenecking"," Turnaround Second Generation Project"." RVP/TVP Reduction Project".
May 2011June 2012
1 year 2 months
Consolidated Contracting Engineering&Procurement SAL Offshore

Atyrau

Construction, Real Estate, Architecture... Show more

Steel Structural Forman(Construction Department)
Provide on-site supervision needed to clarify drawings and discrepancies; coordinate interfacing of various trades; provide quality standards and reject improper installation; and alert supervisor to potential problems.Direct work crews and advise supervisor of any personnel not performing according to procedures, policies, and schedules.Perform work to assist crew as needed and/or requested by supervisor.Become familiar with the project specifications and peculiarities and offer practical advice pertaining to the various project schedules and budgets.Review project progress, cost reports, schedules, and requirements for completion.Determine and recommend changes in methods, schedules, procedures, and improvements where practical on the project.Maintain a close working relationship with supervisor to ensure proper coordination of responsibility for the project. Notify supervisor of any subcontractor not performing according to specifications or schedule. Ensure proper paper flow of information from field to supervisor regarding delivery commitments, field dimensions, reports, and any other necessary correspondence. Ensure that all company policies/programs including, but not limited to Safety, Prohibited Harassment, Code of Ethics, and EEO are fully enforced at all times on the project. Ensures that equipment is properly cleaned, serviced and stored at the end of each shift. Coordinate and advise supervisor of equipment requirements.Ensure quality standards are maintained. Maintain a neat and orderly job-site and personal appearance. Maintain a positive work atmosphere by acting and communicating in a manner to get along with customers, co-workers and supervisors/managers. Performs other job-related duties as assigned.
August 2009May 2011
1 year 10 months
Consolidated Contracting Engineering&Procurement SAL Offshore

Atyrau, www.ccc.net

Construction, Real Estate, Architecture... Show more

Equipment installation Forman(Construction Department)
Control of implementation of the rules and norms, HSE requirements. Daily tool box talk. Control of PTW for for all types of work in our section. Prompt and strict control on the executing works according on the technical requirements Control all permits issuing for site including the required attachments (Risk assessment, Method Statement, Rescue Plan….).Control all extra works at site with preparation for time sheets(Man power ,equipment’s, consumable material) Cover the requirements for consumable tools and permanent tools between main store and site store. Erection and installation static and rotating equipment’s. Alignment pump and compressors. Preservations. Work's in confined space. Prepare for the visual inspections. Box up. Isolations. Assemble and installations Fin-Fan Coolers, Filter House, Flare
March 2008April 2008
2 months
KaspiMunaiGas

Atyrau, nipi-cmg.kz

Construction, Real Estate, Architecture... Show more

Design Engineer assistent
Passage predipolma practice
June 2006August 2006
3 months
Atyrau Oil Pipeline Managements “KazTransOil”

Atyrau, kaztransoil.kz

Oil and Gas... Show more

Commodity operator (probationer)
Service trade and tank farms, rail and road loading racks, piers, bulk items, main pipelines, tank farms and bulk transshipment points refineries with a turnover, the volume of pumping or pouring oil and gas.Service oil removers, flare management. low-pressure gas tanks, loading racks and sink docks.

Skills

Skill proficiency levels
Teambuilding
Leadership Skills
Quick Learn
Construction
Piping
Mechanical
Static Equipment
Rotation Equipment
Construction Management
Supervision
Oil And Gas
Welding
Pipeline
Tank Farm

Driving experience

Own car

Driver's license category B

About me

Strong will to work in сonstruction, maintenance, TA to improve my professional skills. To be involved in various activities to broaden my knowledge in mechanical, piping, steel structural, civil discipline . I am familiar with oil & gas plant processes and activities. My work experience with mentioned company as well as my education background during my studies has given me valuable knowledge, teamwork experience and communication skills to become a valuable employee. I have a keen eye for detail and I am used to working to deadlines. I am a quick learner and have good computer skills having gained training in all of the packages, including word and excel. I am conscientious, highly motivated and can work well within a team or as individual. I have good leadership qualities.

Portfolio

Higher education

2008
Atyrau Oil and Gas University
Mechanical Engineer, Design & Construction & Operation in pipeline and tank farms.

Languages

KazakhNative


EnglishC1 — Advanced


RussianC1 — Advanced


Tests, examinations

2019
Lifting Operations(SI-119)
LLP Tengizchevroil
2019
Isolations of Hazardous Energy
LLP Tengizchevroil
2019
Safe Excavation Practices
LLP Tengizchevroil
2019
PTW/HA+S, CIIFIA for WRP
LLP Tengizchevroil
2019
Avon NH-15 respirator usage training course
LLP Tengizchevroil
2018
WRAP&TRIC
Yeskertkish Kyzmet Kazakhstan LLP
2018
Basic Offshore Safety Induction and Emergancy Training
Yeskertkish Kyzmet Kazakhstan LLP
2018
H2S(level 2)
Yeskerkish Kyzmet Kazakhstan LLP
2018
PTW(Level 2 Rev.2)
Yeskertkish Kyzmet Kazakhstan LLP
2014
Confined Space Entry
Yeskertkish Kyzmet Kazakhstan LLP
2014
Sour Gas Induction
Seftec Global Training LLC
2014
Fire Warden
Seftec Global Training LLC
2014
Certificate
AQC SVARKA, Specialist in Welding Production Level 2

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter